Commissioning & Validation

The performance of your equipment or facility is critical to the protection of the product, and
in certain applications, the end user. It is therefore vital that your equipment is validated and
in a fully functional and serviceable condition.
As part of the package of services, we can offer a full commissioning, testing and validation
package for our facilities. All will be tested to the relevant standards, using equipment with
calibration traceability. Following completion we will issue a professionally written report
collating all of the results and findings.

The facilities we maintain include:

  • Manufacturing Pharmacies (Hospital & Commercial)
  • Biotechnology
  • Research laboratories
  • Pharmacy aseptic suites
  • Stem cell laboratories
  • Medical device manufacturing facilities
  • Transportable sterile suites
  • Microbiological containment facilities

As part of commissioning and validation, the following tests would be performed:

  • HEPA Filter installation leak tests to PD6609
  • Airborne particle counts to ISO 14644 / BS5295 / cGMP / Fed 209e
  • Room pressure measurements
  • Airflow balances
  • Recovery performance
  • Sound and Light Levels
  • Airflow Visualization
  • Airflow’s and Air Change Rates